ASHGHAL PROJECT

Project – Construction of Flow Diversion in Al Tarfa, Legtaifiya and Jelaiah – C830 

Client – Public Works Authority – ASHGHAL  

Contract Value – QR. 75,375,809.00 

Project Details – The project includes Construction of Sewer Networks in open trenches 1495m length by open cut method, construction of Sewer Networks in trenchless 4224m by NDM method, Construction of 24 No. of in situ concrete manholes along the gravity sewer line in open trenches and 40 No. of in situ concrete manhole shaft along the gravity tunnel sewer, Construction of foul sewer rising mains of 300mm DI main of length approximately 684m, Decommissioning of five pumping stations.  

Project Status – Completed